Free guide — Specifiers
Textile specification checklist: the 12 clauses that prevent a fire-safety rejection
The textile package is the smallest on site and one of the most inspected at handover. This checklist gathers the 12 clauses we most often see missing — with the exact wording to write and the risk each one covers.
What you will find inside
- The 12 essential clauses, ready to paste into your specifications
- The precise risk covered by each clause (fire, blackout, acoustics, deadlines, handover file)
- The 5 pitfalls we see every month at tender stage
- Up-to-date regulatory references (AM 11-14, M ratings, ISO 354)
Written by the Grimpe Aux Rideaux engineering studio — regulatory references verified (Légifrance, July 2026). Guide content in French.
Get the guide for free
Instant access after submission. No spam, promised.